Page 706 - yearbook2011

Basic HTML Version

672
Location : on left bank at Ban Lo Han.
38
sq.km.
WATER YEAR : 2011
THALE SAP SONGKHLA
Khlong Pa Bon at Ban Lo Han , Phatthalung (X.266)
Lat 07 - 01 - 35 N Long 100 - 05 - 51 E
Drainge Area
Amphoe
Pa Bon
Changwat
Phatthalung
Ban
Lo Han
Staff gage
+0.000 m. (A.D.)
B.M.-H.D.
On left bank near the top staff gage.
Elevation
5-time daily readings at 06.00, 09.00, 12.00, 15.00 and 18.00 hours.
Arithmetic means of 5 readings
2007 to date
Rating Operation
Period of Available Gage Records
Basis of Mean Daily Gage Height
Gage Reading Frequency
Zero Gage at Bottom
+7.165 m. (A.D.)
Type of Gage
Bench Mark
Location BM
2007 to date
-
2007 to date
Stable.
No overbank flow.
Records fair. Stage-discharge relation defined by 30 discharge measurements made in 2011.
Rated by Current Meter
Stability of Channel Regimes
Overbank Flow Conditions
General Description
Period of Rating
Rated by Flot
Date
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Annual
----------
-----------------
1
0.70
0.92
0.08
0.30
0.26
0.15
0.30
1.08
0.80
0.79
0.70
0.12
2
0.54
0.44
0.08
0.30
0.28
0.14
0.30
0.70
0.80
1.58
0.70
0.12
3
0.42
0.40
0.08
0.30
0.28
0.14
0.30
0.70
0.80
1.50
0.68
0.10
4
0.40
0.40
0.08
0.30
0.30
0.14
0.30
0.70
0.80
1.10
0.68
0.10
5
0.32
0.32
0.08
0.30
0.30
0.14
0.30
0.70
0.80
1.10
0.60
0.20
6
0.30
0.30
0.08
0.30
0.30
0.14
0.30
0.70
0.80
1.00
0.60
0.29
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Gage Height in Meter (A.D.) Water Year April 1, 2011 to March 31, 2012
7
0.30
0.30
0.08
0.30
0.30
0.14
0.30
0.70
0.70
0.70
0.60
0.60
8
0.30
0.28
0.08
0.30
0.30
0.14
0.30
0.62
0.70
0.50
0.50
0.66
9
0.40
0.18
0.08
0.27
0.26
0.14
0.30
0.53
0.80
0.50
0.10
0.68
10
0.30
0.10
0.08
0.26
0.26
0.16
0.30
0.50
0.80
1.08
0.10
0.70
11
0.30
0.11
0.08
0.26
0.26
0.32
0.30
0.42
0.80
1.20
0.10
0.80
12
0.22
0.18
0.08
0.26
0.26
0.37
0.48
0.28
0.80
1.26
0.08
0.70
13
0.14
0.18
0.13
0.26
0.26
0.30
0.59
0.10
0.99
2.28
0.08
0.60
14
0.14
0.10
0.13
0.18
0.26
0.30
0.54
0.11
0.25
1.60
0.08
0.50
15
0.14
0.08
0.10
0.18
0.12
0.30
0.50
0.12
0.82
1.48
0.08
0.30
16
0.14
0.08
0.10
0.18
0.11
0.30
0.50
0.12
1.21
1.20
0.08
0.10
17
0.14
0.08
0.10
0.18
0.10
0.30
0.48
0.12
1.62
1.40
0.08
0.10
18
0.14
0.08
0.18
0.18
0.10
0.30
0.44
0.12
2.24
1.30
0.08
0.10
19
0.17
0.08
0.30
0.18
0.10
0.30
0.40
0.12
1.69
1.10
0.08
0.10
20
0.28
0.08
0.30
0.18
0.10
0.30
0.40
0.12
1.51
1.10
0.08
0.10
21
0.20
0.08
0.30
0.18
0.10
0.30
0.40
0.27
1.40
1.10
0.08
0.10
22
0.20
0.26
0.30
0.18
0.10
0.30
0.40
0.26
1.40
1.10
0.08
0.10
23
0.20
0.21
0.30
0.18
0.10
0.30
0.40
0.25
1.40
0.90
0.08
0.10
24
0.16
0.08
0.30
0.18
0.10
0.30
0.56
0.49
1.46
0.90
0.08
0.10
25
0.10
0.08
0.30
0.18
0.10
0.30
0.56
0.33
1.39
0.90
0.08
0.10
26
0.10
0.08
0.27
0.18
0.10
0.30
0.62
0.33
1.36
0.90
0.08
0.10
27
0.10
0.10
0.32
0.23
0.10
0.30
0.69
0.36
1.30
0.90
0.11
0.12
28
0.08
0.10
0.26
0.20
0.13
0.35
0.10
0.50
1.30
0.90
0.12
0.12
29
0.08
0.10
0.29
0.20
0.15
0.35
0.10
0.68
1.34
0.73
0.12
0.14
30
0.10
0.10
0.30
0.20
0.20
0.35
0.23
0.70
1.29
0.60
0.13
31
0.10
0.20
0.20
0.77
0.60
0.60
0.12
----------
--------------
Mean
0.24
0.19
0.17
0.23
0.19
0.26
0.40
0.42
1.10
1.07
0.24
0.26
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Max
0.70
0.92
0.32
0.30
0.30
0.37
0.77
1.08
2.24
2.28
0.70
0.80
2.28
Min
0.08
0.08
0.08
0.18
0.10
0.14
0.10
0.10
0.25
0.50
0.08
0.10
0.08
2.54
m. (A.D.) ,
0.00
m. (A.D.) ,
River Bed -0.05
m. (A.D.)
7.11
m. (A.D.) ,
7.01
m. (A.D.) ,
Drainage Area
38
Square Kilometers
at 06.00 Hours , on Jan 13 , 2011
Annual Max Momentary Gage Height
Zero Gage at Bottom Elevation
Right Bank Elevation
Left Bank Elevation