801
WATER YEAR : 2013
PING RIVER BASIN
Nam Mae Lai at Ban Pong Din , Chiang Mai (P.80)
Lat 18 - 54 - 49 N Long 99 - 14 - 17 E
Location : on left bank at the bridge on road.
Ban
Pong Din
Amphoe
Doi Saket
Changwat
Chiang Mai
129
sq.km.
Method of sampling
Depth Integrating
US.D-49
Period of Available Records
2007-Cont'd
Drainge Area
Instrument Used
Actual Measurement
2007-Cont'd
2013
35
0.8750
Continued Sediment Station
Remarks
R-Square
Number of observation
Using Rating Curve Water Year
QS = 2.3127 QW
1.34760
Date
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar Annual
----------
-----------------
1
0.50
0.30
0.50
0.70
8.40
11.10
11.90
11.10
4.70
3.10
1.40
1.30
2
0.50
0.30
0.50
0.70
4.40
9.70
15.50
11.10
4.70
2.50
1.40
1.20
3
0.30
0.30
0.60
0.60
3.70
7.70
11.90
11.10
4.70
2.50
1.70
0.90
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Suspended Sediment , in Tons per Day. Water Year 1 April 2013 to 31 March 2014
4
0.30
0.30
0.60
0.70
3.10
6.50
11.10
11.10
4.70
2.50
1.60
0.90
5
0.30
0.30
0.80
7.70
3.40
8.40
20.20
10.40
4.70
2.50
1.70
0.80
6
0.30
0.30
3.70
4.70
3.40
44.70
14.60
9.00
4.40
2.50
1.70
0.80
7
0.30
0.30
1.30
3.70
2.80
11.90
7.70
9.00
3.40
2.30
1.70
0.80
8
0.30
0.30
1.30
2.80
9.70
9.70
7.70
9.00
4.10
2.30
1.70
0.80
9
0.30
0.30
1.00
9.70
23.60
17.30
7.70
7.10
3.40
2.30
1.70
0.80
10
0.30
0.30
1.00
8.40
18.30
18.30
7.70
6.50
3.40
2.30
1.70
0.80
11
0.30
0.30
0.80
9.00
31.80
11.10
7.70
7.70
3.10
2.30
1.70
0.70
12
0.30
0.30
2.30
4.10
15.50
13.70
7.70
7.10
3.10
2.30
1.40
0.70
13
0.30
1.40
2.30
3.70
21.30
15.50
7.70
7.10
3.10
2.50
1.70
0.70
14
0.30
0.50
1.70
2.80
13.70
11.10
5.90
6.50
3.10
2.30
1.70
0.70
15
0.30
0.30
0.90
2.00
10.40
11.90
4.70
6.50
3.10
2.00
1.70
0.50
16
0.30
0.30
0.50
3.10
23.60
21.30
4.40
6.50
3.10
2.00
1.70
0.50
17
0.30
0.30
0.40
5.90
19.30
18.30
9.00
6.50
3.10
2.00
1.70
0.50
18
0.30
0.30
0.40
3.70
10.40
28.20
67.70
7.10
3.10
2.00
1.60
0.60
19
0.30
0.30
0.50
2.80
9.00
14.60
60.30
9.00
3.10
2.00
1.30
0.60
20
0 30
0 30
0 70
2 30
7 10
9 70
27 00
17 30
3 10
1 70
1 30
0 60
.
.
.
.
.
.
.
.
.
.
.
.
21
0.30
0.40
0.50
2.50
7.10
11.10
22.40
7.70
3.10
1.60
1.30
0.50
22
0.30
0.70
0.50
22.40
41.40
11.10
22.40
4.70
3.10
1.60
1.30
0.50
23
0.30
0.50
0.50
12.80
22.40
11.10
19.30
4.40
3.10
1.70
1.30
0.50
24
0.30
0.50
0.50
5.30
14.60
8.40
16.40
4.10
3.10
1.70
1.30
0.50
25
0.30
0.50
0.30
20.20
10.40
7.70
38.10
3.40
2.80
1.70
1.30
0.70
26
0.30
0.50
0.60
5.30
8.40
7.70
17.30
4.10
3.10
1.70
1.00
0.50
27
0.30
0.50
1.00
4.10
10.40
17.30
15.50
4.10
3.10
1.70
1.00
0.50
28
0 30
0 40
1 00
3 40
9 00
20 20
13 70
5 90
3 10
1 70
1 30
0 50
.
.
.
.
.
.
.
.
.
.
.
.
29
0.30
0.50
1.00
4.40
9.00
11.10
16.40
4.70
3.10
1.70
0.50
30
0.30
0.50
0.90
11.10
7.70
11.10
11.10
5.30
3.10
1.70
0.50
31
0.50
15.50
9.00
11.10
3.10
1.70
0.50
----------
--------------
Total
9.40
12.80
28.60 186.10 392.30 417.50 521.80 225.10 107.00
64.40
41.90
20.90 2027.80
Ton
Mean
0.30
0.40
1.00
6.00
12.70
13.90
16.80
7.50
3.50
2.10
1.50
0.70
Max
0.50
1.40
3.70
22.40
41.40
44.70
67.70
17.30
4.70
3.10
1.70
1.30
67.70
Min
0.30
0.30
0.30
0.60
2.80
6.50
4.40
3.40
2.80
1.60
1.00
0.50
0.30
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------