770
Location : on left bank at the bridge on highway.
Ban
Mae Tae
Amphoe
San Sai
Changwat
Chiang Mai
WATER YEAR : 2014
PING RIVER BASIN
Ping River at Ban Mae Tae , Chiang Mai (P.67)
Lat 19 - 01 - 11 N Long 98 - 57 - 43 E
5,323 sq.km.
Method of sampling
Depth Integrating
US.D-49
Period of Available Records
1997-Cont'd
Actual Measurement
1997-Cont'd
2014
Drainge Area
Using Rating Curve Water Year
Instrument Used
33
0.8680
Continued Sediment Station
QS = 1.4543 QW
1.54310
Suspended Sediment , in Tons per Day. Water Year 1 April 2014 to 31 March 2015
Remarks
R-Square
Number of observation
Date
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Annual
----------
------------------
1
59.30
21.60
52.50
43.90 176.30 1665.30 697.10
73.80
33.90
2.90
31.60
12.60
2
59.30
27.10
73.80
49.20 141.20 1746.30 255.90
59.30
46.50
2.60
20.00
10.10
3
49.20 255.90
43.90
23.20 273.30 5186.60 161.90 109.00
43.90
5.00
3.90
7.80
4
9.30 371.00
20.00
27.10 371.00 3341.40 148.00
73.80
38.80
5.70
15.40
3.30
5
49.20 465.70
14.00
27.10 320.20 2722.10 113.90 141.20
33.90
7.00
2.00
2.90
6
99 30 119 00
10 10
24 90 392 00 1507 50 206 30 129 30
31 60
7 80
7 80
9 30
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
.
.
.
.
.
.
.
.
.
.
.
.
7 104.10
85.40
14.00
23.20 1147.20 1084.40 124.10 255.90
29.30
2.90
59.30
41.30
8
62.80
55.90
33.90
31.60 761.20 982.60
81.40 148.00
27.10
5.00
36.30
23.20
9
12.60
46.50
49.20 161.90 697.10 517.30
66.40
89.90
31.60
9.30
27.10
21.60
10
7.00
62.80
94.60 416.10 745.00 428.30
49.20 109.00
31.60
81.40
4.40
3.90
11
16.90 134.50
85.40 222.40 589.90 350.40
46.50 183.60
33.90
36.30
2.60
3.30
12 169.10 134.50
85.40 206.30 371.00 255.90
38.80
77.60
16.90
16.90
2.00
2.90
13 148.00 141.20 109.00 169.10 238.90 238.90
73.80
59.30
29.30
14.00
6.40
4.40
14 129 30 109 00 183 60 191 10 183 60 264 60 148 00
55 90
27 10
8 50
49 20
38 80
.
.
.
.
.
.
.
.
.
.
.
.
15 141.20
49.20 176.30 560.50 453.10 273.30
59.30
52.50
27.10
6.40
36.30
31.60
16
24.90 104.10 148.00 214.30 404.00 392.00
49.20
62.80
23.20
4.40
29.30
24.90
17
14.00 104.10 124.10 161.90 282.10 865.10
36.30
77.60
16.90
3.90
5.70
2.60
18
27.10
33.90 129.30 148.00 183.60 350.40
41.30
94.60
21.60
7.80
8.50
2.00
19 113.90
46.50 141.20 206.30 134.50 381.50
41.30
89.90
18.40
6.40
7.80
1.20
20 104.10
43.90 141.20 291.10 381.50 604.90
55.90
70.10
52.50
3.90
10.10
3.90
21 109.00
29.30 119.00 191.10 1665.30 404.00 134.50
33.90
41.30
7.00
46.50
38.80
22
55.90
29.30
99.30 129.30 1256.90 310.40
33.90
38.80
11.30
52.50
41.30
33.90
23
16.90
18.40
99.30 124.10 761.20
77.60
81.40
59.30
7.80
43.90
27.10
20.00
24
11.30
55.90
89.90 148.00 340.20
89.90 183.60
52.50
7.00
38.80
8.50
1.20
25
24.90
89.90
59.30 129.30 161.90 183.60 169.10
46.50
7.00
41.30
6.40
0.70
26
99.30
99.30
41.30 124.10 392.00 416.10 161.90
43.90
8.50
24.90
4.40
0.50
27 104.10 141.20
52.50 340.20 982.60 371.00
89.90
29.30
7.80
7.00
4.40
2.90
28 113.90 148.00
52.50 575.10 531.50 453.10
66.40
43.90
6.40
6.40
11.30
36.30
29
70.10 161.90
52.50 1043.20 665.90 320.20
81.40
36.30
4.40
4.40
24.90
30
27.10 141.20
49.20 619.90 650.40 777.50 230.60
31.60
3.90
7.80
20.00
31
119.00
264.60 2224.10
104.10
3.30
41.30
2.60
----------
--------------
Total
2033.10 3445.20 2444.30 6888.10 17878.70 26562.20 3831.40 2429.10 723.80 513.40 515.60 433.40 67698.30
Ton
Mean
67.80 111.10
81.50 222.20 576.70 885.40 123.60
81.00
23.30
16.60
18.40
14.00
Max
169.10 465.70 183.60 1043.20 2224.10 5186.60 697.10 255.90
52.50
81.40
59.30
41.30 5186.60
Min
7.00
18.40
10.10
23.20 134.50
77.60
33.90
29.30
3.30
2.60
2.00
0.50
0.50
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------